[3dem] How long do Titan Krios installations typically take?

David Timm david.timm at biochem.utah.edu
Wed May 23 17:18:00 PDT 2018


How long do Titan Krios installations really take? We were told today that our svc engineers needed to order a replacement HT tank for our new installation. I didn't expect that a 2-3 month install would really happen, but thought the end would be in sight after 5 months. What are the real experiences with installation times? Thanks, Dave Timm

=======================================
David E. Timm, Ph.D.
Electron Microscopy Core Laboratory
Department of Biochemistry
2501 SMBB
University of Utah
Salt Lake City, Utah 84112 USA
Phone  317.298.9048
FAX  801.587.3077
david.timm at biochem.utah.edu
=======================================
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mail.ncmir.ucsd.edu/pipermail/3dem/attachments/20180524/cdb12d36/attachment.html>


More information about the 3dem mailing list